EShapeoko 1.0 and 1.1 Assembly Instructions

From Amber Spyglass Ltd
Revision as of 14:09, 26 October 2012 by Admin (talk | contribs)
Jump to navigation Jump to search

Step 1: Assemble the V-wheels

EShapeOko assembly step 01 V-wheel 1.png

Item Count Part Number Part Description
For each wheel
1 1 EM-MW1 V-wheel sleeve
2 2 EM-G5 5 x 16 x 5mm bearing
3 1 EM-W5P 5mm precision washer

Lay one bearing on a flat surface. Push a V-wheel sleeve over it. The parts are designed to force-fit, so push firmly straight down. Thread this on a long M5 bolt, bearing side first, followed by a precision washer and the second bearing. Place the second bearing on a flat surface, and push the V-wheel sleeve over it too. Make sure both bearings are all the way in. Remove the bolt.

EShapeOko assembly step 01 V-wheel 2.png

Repeat 16 times (20 if you have the dual-X upgrade).

Step 2: Assemble the smooth idler wheels

EShapeOko assembly step 02 idler wheel 1.png

Item Count Part Number Part Description
For each wheel
1 1 EM-MW2 Smooth idler wheel sleeve
2 2 EM-G5 5 x 16 x 5mm bearing
3 1 EM-W5P 5mm precision washer

Lay one bearing on a flat surface. Push an idler wheel sleeve over it (lip up, of course). The parts are designed to force-fit, so push firmly straight down. Thread this on a long M5 bolt, lip side first, followed by a precision washer and the second bearing. Place the second bearing on a flat surface, and push the idler wheel sleeve over it too. Make sure the bearings are all the way in. Remove the bolt.

EShapeOko assembly step 02 idler wheel 2.png

Repeat 6 times.

Step 3: Mount the V-wheels on the right Y panel

EShapeOko assembly step 03 right Y wheels.png

EShapeOko assembly step 04 right Y motor.png

EShapeOko assembly step 05 left Y carriage 1.png

EShapeOko assembly step 05 left Y carriage 2.png

EShapeOko assembly step 06 X carriage 1.png

EShapeOko assembly step 07 X carriage 2.png

EShapeOko assembly step 08 X carriage 3.png

EShapeOko assembly step 09 gantry.png

EShapeOko assembly step 10 frame 1.png

EShapeOko assembly step 11 frame 2.png

EShapeOko assembly step 12 Z leadscrew.png

EShapeOko assembly step 13 Z motor.png

EShapeOko assembly step 14 Z rail.png

EShapeOko assembly step 15 spindle mounts.png

EShapeOko assembly step 16 Z axis.png